Specification & standards · Glossary
SBC 301
Also called: Saudi Building Code loads
The Saudi Building Code for loads and forces on structures, including dead, live, wind and seismic loads. Its seismic provisions decide where structures need seismic separation joints.
Related terms in Specification & standards
- TCNA EJ171
- The Tile Council of North America method for movement joints in tiled floors. It places joints at perimeters, changes of plane and structural joints, and across the field at about 6.1–7.6 m indoors and 2.4–3.7 m outdoors or in sun.
- BS EN 13030
- The European test for louvres under simulated rain. It classes rain defence from A (99% effective or better) to D (under 80%) and airflow by discharge coefficient from class 1 to 4.
- EN 13403
- The European standard for ductwork made from insulation ductboards, such as pre-insulated phenolic and PIR panels. It covers pressure resistance, air tightness classes, stiffness, particle emission, cleaning and supports.
- DIN 51130
- The German ramp test for slip resistance of floors walked on in shoes, giving classes R9 (lowest) to R13 (highest). Indoor entrances need R9, outdoor entrances R11 or R10 with displacement space.
- Saudi Architecture Characters Map
- The map launched in March 2025 that defines 19 regional architectural styles across Saudi Arabia, such as Central Najdi, Hejazi Coast and Abha Highlands, to guide the design of new buildings in each region.
- King Salman Charter for Architecture and Urbanism
- The charter of the Saudi Architecture and Design Commission, launched as an initiative in December 2021, that sets six values for Saudi architecture and urbanism: authenticity, continuity, human centricity, livability, innovation and sustainability. The architecture it codifies is widely called Salmani architecture.
- TCNA EJ171
- The Tile Council of North America guideline for movement joints in tile: every 6.1 to 7.6 m indoors, every 2.4 to 3.7 m outdoors or in sun or moisture, plus perimeters and changes of plane.
- BS 7953
- The British Standard for entrance flooring systems: selection, installation and maintenance. Matting should be at least 2.1 m long in the walking direction, longer where space allows.