Raised floors · Nord Floors

Raised access floors in Saudi Arabia: a buyer's guide

Panel types, load grades, finished floor heights, fire and test evidence, and the questions to ask a raised floor supplier in the Kingdom.

Raised floor panel production line in Dammam (illustration)

Short answer: in Saudi Arabia, most office and data projects are best served by a steel cementitious panel, rated at 4.5 kN or more, tested to CISCA, from a supplier who can show real projects, deliver on time and send their own installers. Buying from a local manufacturer shortens lead times and puts the people who made the panel in front of your consultant.

Why raised floors are everywhere in the Kingdom's new offices

From the towers of KAFD in Riyadh to new headquarters across Jeddah and the Eastern Province, open-plan offices need power and data at every desk and the freedom to rearrange. A raised access floor gives both: cables run in the void, and any panel can be lifted to add an outlet. Data centres and control rooms use the same void as an air plenum for cooling.

1. Choose the panel type

  • Steel cementitious (a steel shell filled with a cementitious core) is the workhorse: strong, non-combustible, solid underfoot and tolerant of the climate. It suits carpet tiles, LVT and SPC directly, and stone or parquet on a board layer.
  • Calcium sulphate panels are denser and stiffer. With interlocking grooved edges they are the premium answer for stone and porcelain bonded straight to the panel.
  • Woodcore panels are lighter and cheaper, but particleboard is sensitive to humidity and water. We recommend steel cementitious for Saudi conditions.
  • Factory-finished panels with antistatic HPL or static dissipative vinyl are for server rooms, data centres and control rooms.

2. Size the load grade for the worst day

A panel's grade is its concentrated load: the force on a small point like a chair leg or cabinet foot. Check the rolling load too if anything on wheels will cross the floor.

  • Ordinary offices: 4.5 kN is our recommended minimum. Lighter grades can carry office loads on paper, but a stiffer floor sounds solid, stays quieter and lasts longer.
  • Scissor lifts and mobile elevating work platforms (MEWPs) for ceiling access: 6.8 kN and above.
  • Data halls: start at 4.5 kN and check loaded racks on their castors.

3. Set the finished floor height (FFH)

FFH is slab to top of finish. It must clear the biggest thing in the void: cable trays crossing, floor boxes, and in data centres enough depth for air. Taller floors need stringers and mechanical anchoring of the pedestals. At Nord Floors we use chemical anchoring up to 600 mm FFH, and mechanical anchoring with stringers above it.

4. Ask for real test evidence

Load figures should come from tests to the CISCA Recommended Test Procedures for Access Floors (concentrated, ultimate, uniform, rolling and impact loads), with a report you can read. Ask for the reaction-to-fire classification of the panel and finish, and for the acoustic data if impact noise matters.

5. Ask the questions that separate suppliers

  1. Where is it made? A local factory means shorter lead times, easier factory visits and quicker replacement panels.
  2. Who installs it? Own installation teams working to a method statement beat a chain of subcontractors.
  3. Can I see projects? Ask for references in buildings like yours.
  4. What happens if a panel is damaged? You want a supplier who can supply matching panels years later.
  5. What is in the submittal? Data sheet, test reports, installation guide, method statement, CAD details.

Why we make ours in Dammam

Nord Floors manufactures nSteelCement, nGroove, nHPL and nSDV raised floor panels in our own factory in Dammam Industrial Area 2, with six load grades from 3.7 to 11.1 kN, tested to CISCA. We have delivered 200+ raised floor projects, more than 40 of them in KAFD, where much of the Kingdom's raised flooring goes and only proven quality gets in.

Try the raised floor selector: pick the finish and what the floor will carry, and get the series, grade and spec clause in a few taps. Or book a factory visit.

Sources

  • CISCA, Recommended Test Procedures for Access Floors.
  • Nord Floors technical data sheets (load grades, FFH, anchoring rules).

Specify a raised floor in five minutes

Answer a few questions about the room and loads. We’ll recommend the series and grade and work out the airflow.

Open the selector
#raised access floor#raised floor Saudi Arabia#KAFD#Riyadh#specification