Specification & standards · Glossary
Method statement
A document that describes step by step how a system will be installed safely and to specification.
Related terms in Specification & standards
- Submittal
- The package of data sheets, test reports, drawings and samples sent to the consultant for approval before materials are ordered.
- Material approval request (MAR)
- The formal request on Saudi projects for the consultant to approve a material before it is used.
- MasterFormat
- The standard numbering system for construction specifications. Raised access floors sit in section 09 69 00, carpet in 09 68 00, HVAC ducts in 23 31 00.
- Mock-up
- A sample installation built on site for approval of the finish, detailing and workmanship before full installation.
- CISCA
- The Ceilings & Interior Systems Construction Association, whose Recommended Test Procedures for Access Floors define how concentrated, ultimate, uniform and rolling loads are tested.
- PSA MOB PF2 PS/SPU
- The UK Property Services Agency specification for raised access floors, still widely referred to for light, medium, heavy and extra-heavy grades.
- EN 13501-1
- The European reaction-to-fire classification for construction products, from A1 (non-combustible) to F, with smoke (s) and droplet (d) sub-classes.
- BS 476
- The older British fire test series. Parts 6 and 7 together give the "Class 0" rating still common in Gulf specifications.